Installation 1Install new manifold seals on block, and new gaskets on cylinder headsUse only side gaskets having metal inserts covering the center exhaust passageUse sealer at water passages and where seals butt to gaskets IT]

2Install intake manifoldTighten bolts in the sequence shown, 7.4 GSi: 30 ftIbs{40 Nm}, 8.2 GSi: 35 ftIbs(47 Nm)
1Notel Check torque of the intake manifold screws annuallyThe
center screws can become loose under normal usage3Install distributor with rotor and align exactly as marked during removalInstall clamp and tighten screw to 25 ftIbs(34 Nm)NOTE: If engine was cranked while distributor was out, complete ignition timing procedure must be followed4Install distributor cap and high tension leads5Place main wire harness under clamps on port side of manifold and at front of manifoldMake other wire connections as necessary