2010-2011 Yamaha RS Vector / RS Venture Service Manual, Page 481Get this manual

2010-2011 Yamaha RS Vector / RS Venture Service Manual, Page 481

CABLE ROUTING ECU band ECU (engine control unit) Put the branched ECU lead with the identifier tape on top of the other branched lead (match the connector type with the outlet)Intake air temperature sensor Fasten the oil cooler inlet hose, oil pressure switch sub-lead and crankshaft position sensor lead with plastic bandPoint the end of the plastic band rearwardTo headlight To auxiliary DC jackRoute the auxiliary DC jack lead outermost of all the other leadsFasten the fuel hose, fuel pump lead and speed sensor lead with plastic bandThe plastic band should not be front of the fuel tank2040 mm (0.791.57 in) Fasten the fuel hose and fuel pump lead with plastic bandFuel tank breather hose Compression spring Insert the projection on the wire harness holder into the hole in the frame cross memberMake sure the speed sensor lead and wire harness do not contact the end of frame cross member pipeFasten the wire harness and speed sensor lead with holderFasten the holder together with the frame cross member and framePoint the clamp on the hose upwardInsert the fuel tank breather hose until it contacts the running board supportOil can be applied when insertingTo relay Speed sensor lead holder Align the punch mark with the rivet