2007-2008 Yamaha Phazer Venture-Lite 500 Factory Service Manual, Page 532Get this manual

2007-2008 Yamaha Phazer Venture-Lite 500 Factory Service Manual, Page 532

CABLE ROUTING PZ50VTPZ50MP
Headlight unit Headlight lead coupler Headlight lead Fasten the headlight lead at the white tape to the shroud frame with the plastic band, making sure to position the band near the bracket5 Fasten the headlight lead to the shroud frame with the plastic band, making sure to route the lead along the bend in the frame6 Route the headlight lead to the inside of the shroud frame1 4