2009-2010 Ski-Doo REV-XP/XR 2 Stroke and REV-XR 1200 4-TEC Service Manual, Page 805Get this manual

2009-2010 Ski-Doo REV-XP/XR 2 Stroke and REV-XR 1200 4-TEC Service Manual, Page 805

Section 02 ENGINE Subsection 08 (CYLINDER HEAD)

NOTEAfter the reassembly of camshafts is completed, check for easy movement of camshaft and cam fo llow ers
Replace cam follo er, if out of specification
Cam Follower Shaft Inspection
Check cam fo ll ower shaft for scoringw ear or other damages eas ure cam fo llow er shaft diameter, using micrometer
Camshaft Installation
Refer to CAMSHAFT TIMING GEAR INSTALLA TION in this subsection
CAM FOLLOWERS
Cam Follower Removal
1Remove ca mshafts Refer to CA SHAFT TIMING GEAR2Disassemble camshaftsRefer to CAMSHAFT 3Remove cam fo llowers and spacer from cam follower sha ft,Cam follower shaft

CAM FOLLOWER SHAFT DIAMETER NEW
2 Spacer Cam follower shaft
I Cam followers

7.972 mm to 7.980 mm (.31 39 in to .3142 in)
7.960 mm (.3134 in)

SE RVICE LI MIT

Cam Follower Inspection
Check surfaces of cam follower for scoringw ear or other damages easu re cam follow er bore inner diameter, using sma ll bore gauge