2005 Ski-Doo RT Series Shop Manual, Page 56Get this manual

2005 Ski-Doo RT Series Shop Manual, Page 56

Section 02 ENGINE Subsection 04 (ENGINE REMOVAL AND INSTALLATION)
A35C2DA

INSERT REAR TAB 1Rear tab 2Rubber mount

A35C2FA

RH SIDE MAGNETO HARNESS ROUTING

Make sure RH side engine supports are properly positioned on rubber mounts
Oil Pump Adjustment
After engine installation, verify oil pump adjustment, adjust if necessaryRefer to OIL INJECTION SYSTEM sub-section
Heat Exchanger Outlet Hose
Make sure that heat exchanger outlet hose is routed as per photo2 1

Fuel Injectors
Lubricate fuel injectors O-ring with Molykote 111 (PN 413 707 000) before fuel rail installationRespect the following tightening torque specifications: