2004 Skidoo ZX Series Service Manual, Page 127Get this manual

2004 Skidoo ZX Series Service Manual, Page 127

Section 04 ENGINES (2-STROKE) Subsection 01 (377 AND 552 ENGINE TYPES)
A17C07A

Bearing Feeler gauge Plain oil seal mm (.040 in)

Crankcase halves nos.1 and are factory matched and therefore, are not interchangeable as single halvesCrankcase Assembly IMPORTANT: The total assembly sequence, including sealing compound spreading, screwing and torquing of bolts according to the proper sequence must be performed within 10 minutesBefore screwing both parts of crankcase, seal it with sealing compound (PN 420 297 906)Make sure surfaces are clean and degreased before applying sealing compoundSpread seam of 1.2 mm (116 in) maximum in diameter on surface of lower crankcase half
Align both crankcase halves before tightening screwsPosition the crankcase halves together and tighten bolts by hand then install and tighten armature plate on magneto side to correctly align the crankcase halvesScrew the central bolts (bolts no1 to no4 in the torquing sequence) to squeeze compound between crankcase halves before it starts to dryNOTE: Sealing compound spreading plus screwing of engine four central bolts must be performed within minutes to ensure good sealing and avoid linkingScrew all crankcase bolts in place in the following sequence and to the appropriate torque through two steps torquing: first, screw bolts up to 60 of the final torque 13 Nm (115 lbfin) for M8 bolts), then, tighten to the required torque (i.e22 Nm (16 lbfft)552 Engine Type