1996 Ski-Doo Shop Manual, Volume 3, Page 236Get this manual

1996 Ski-Doo Shop Manual, Volume 3, Page 236

Section 06 ELECTRICAL b-S ectio 04 (B ATT ERY) ;
1Re move the sealing tub fro the vent elbo wInstall ve nt tub e, include in th battery kit, to batt ery elbowW INilure re th se alin tu co uld re sult in plosio n
A 17E0H A

5R adjust th ele ctrolyt le el to th UPP ER LE VEL line
A 17E0FA

1Battery ele ctrolyte

2Re move caps and fill battery to UPPER LE VEL line ith ele ctrolyte (spe cific gravity1.260 at 20C (68F))3Allow the battery to stand for 30 minute INIM so that ele ctrolyt soak through battery cellsA 17E0R A