1996 Ski-Doo Shop Manual, Volume 2, Page 100Get this manual

1996 Ski-Doo Shop Manual, Volume 2, Page 100

Section 04 ENGINE b-S ectio 02 (LE ES and GIN DIM SIO RE T)
CRTA RY VA LV AP
E GI YPE Liquid cooled engines MI NI 0.27 (0.011 in) XIMUM 0.40 (0.016 in)

First eth To easure this gap use eler gauge inserted be rotary valve and upper crankcase ith the rotary valve cover in place it ut its O-rin gCh eck the most surface as possibleFollo the sam proce dure ith th lo er crankcase
Install short piece (13 (12 in) long) of solder directly on rotary valve, on above and on elo rotary valve ge arA pply gre ase to hold solder in positionReinstall cover in place WIT its -ring and torqu scre to 20 Nm (15 lbfft)R cov er th cl an an as ure mpressed solder thickne ss, it ust be ithin the spe cified tolerance F01D3PA

T YPIC 1Sold er

C KIN RFA FL AT S