1989 Ski-Doo Repair Manual, Page 158Get this manual

1989 Ski-Doo Repair Manual, Page 158

Section 02 ENGINE Sub-section 06 (536 ENGINE TYPE)
- Tighten puller bolt and at same time, tap on bolt head using hammer to release magne10 from its taper
- Install new receptacle connector to the blackyellow striped wire- To install the ground connector to the armature platetape the new black lead to 1he old one and pull it under 1he lighting coil with the old wire- SOlder an eye connector to the lead and fasten it under 1he wire re1aining clip
2, Generating coil
To replace generating coil:Heat the armature plate to 93C (20QoF) around the screw holes to break the loctite bond
Eyt'conneclm
.0.001002001

AOOI 002 003

4,', Generating coil screwLoctite 242
To install the new coil on the armature plate, remove the shipping nuts from the new coil and apply Loctite 242 (blue, medium strength) to scr9l.vs before assembly