2013 600 IQ Racer Service Manual 9923892, Page 140Get this manual

2013 600 IQ Racer Service Manual 9923892, Page 140

Steering and Suspensions Break-In
After installing new rail sliders they must be "broke in" for longer life and better wear patternsWhen performing the breaking in procedure ride the sled on surface that has adequate snow conditions with deeper snow nearbyRun the sled on the adequate snow surface and dip into the deeper snow every so often
Installation CAUTION
Always use new fasteners when securing the torque arms to the tunnel1With the unit on its left side, place the suspension in the tunnel2Align the front and rear torque arms with the tunnel mounting holesLoosely install two new fasteners3Set the snowmobile on to its right sideInstall two new torque arm fasteners and related hardware4Set the snowmobile with the skis and track on the ground5Torque the front and rear suspension mounting bolts to specification
REAR SUSPENSION REMOVAL AND INSTALLATION
Removal