2010-2012 PRO-RIDE RUSH Switchback RMK Service Manual, Page 385Get this manual

2010-2012 PRO-RIDE RUSH Switchback RMK Service Manual, Page 385

Battery and Electrical Systems 6After the reset passcode process is complete, the following screen will be displayedClick on the RETURN button to return to the main screen
Security System: Instrument Cluster Initialization
Instrument cluster initialization is one-time procedure that must be performed when the instrument cluster is linked for the first time to security-enabled ECUThe ECU and instrument cluster must be powered at the same timeThis can be done by either starting and running the engine in well-ventilated area, or with the chassis power-up harness and dual power-up adapterSkip steps and when performing the procedure with the engine runningWhen using the chassis power-up harness and dual power-up adapter, follow these steps: