2010-2012 PRO-RIDE RUSH Switchback RMK Service Manual, Page 373Get this manual

2010-2012 PRO-RIDE RUSH Switchback RMK Service Manual, Page 373

Chassis 5Remove the four remaining brace screws and nutsNote the screw located on the inside of the brace attaching the brace to the bulkhead cooler8Note the residual adhesive on the brace, bulkhead clip and tunnelIf the component is to be re-used, the adhesive must be completely removedSee Bonded Component Surface Preparation section
6When all of the noted fasteners, nuts, and screws are removed, the next step is to heat where the brace mounts to the tunnel and bulkhead clip7Wearing heat resistant gloves, use propane gas torch to heat the where the brace mounts to the tunnel and bulkhead clipApply torch until adhesive begins to crackleDuring this time, the adhesive may smoke and bubbleContinue heating the area until the brace can be separated from the bulkhead and tunnelNOTE: Left side shown