2010-2012 PRO-RIDE RUSH Switchback RMK Service Manual, Page 372Get this manual

2010-2012 PRO-RIDE RUSH Switchback RMK Service Manual, Page 372

Chassis Left Support Brace Installation
1Verify the bulkhead clip, side brace, and tunnel are thoroughly cleaned and all residual adhesive is removed from the parts2Gather together the T40 screws and nuts, and engine mounts3The next assembly step is applying the adhesiveThoroughly read and understand the Adhesive Applicator Tool and Adhesive Application sections before proceeding4Apply the adhesive to the front and rear of the left side brace as outlined in the Adhesive Application section5Install the braceTorque fasteners to specificationNote the screw on the inside of the brace mounting the brace to the bulkhead coolerNOTE: Allow the adhesive to cure for 24 hours at 68 (20 C) before placing the snowmobile back into service
Right Support Brace Removal
1Remove the following components: Rightleft engine compartment door Hood Nosepanbumper Exhaust pipesilencer Exhaust silencer bracket Chaincase componentschaincase Oil tankclutch cover assembly Airbox assembly Engine assembly Bulkhead floor plate Right side front suspension components Fuel tank (remove fuel hoses and gasoline from tank) 2Drill out the rivets securing the right fender to the bulkhead and chassis3Disassemble the chaincaseRemove the chaincase from the tunnel and braceNOTE: 2012 models feature bonded chaincases