2010-2012 PRO-RIDE RUSH Switchback RMK Service Manual, Page 370Get this manual

2010-2012 PRO-RIDE RUSH Switchback RMK Service Manual, Page 370

Chassis Torque screws to specification10Reinstall the idler arm bolt and nutTorque nut to specification
Idler Arm Nut: 37 ft-lb (50 Nm)

Over Structure-to-Bulkhead Fasteners: 22 ft-lb (30 Nm) 9Reinstall the cross shaft fastenerTorque to specification
11121314
Reinstall the tie rod bootReinstall the bulkhead floor plateReinstall the right fender assembly using new rivetsReinstall the following components: