2010-2012 PRO-RIDE RUSH Switchback RMK Service Manual, Page 362Get this manual

2010-2012 PRO-RIDE RUSH Switchback RMK Service Manual, Page 362

Chassis 6Remove any residual adhesive from the tunnel and or cooler if it is going to be re-used8Reinstall the following components: Rightleft engine compartment door Hood Exhaust pipesilencer Oil tankclutch cover assembly Airbox assembly Engine assembly Driven clutch Bulkhead floor plate Fuel tank assembly NOTE: Allow the adhesive to cure for 24 hours at 68 (20 C) before placing the snowmobile back into service
Front Tunnel Bulkhead Cooler Installation
1If installing the original bulkhead cooler, verify all of the original adhesive is removed from the mating surface2The next assembly step is applying the adhesiveThoroughly read and understand the Adhesive Applicator Tool and Adhesive Application sections before proceeding3Apply the adhesive to the bulkhead coolerReference the illustration in the Adhesive Application Patterns section4Install the cooler using new rivets5Install the fasteners securing the cooler to the engine support bracesTorque to specification