2010-2012 PRO-RIDE RUSH Switchback RMK Service Manual, Page 338Get this manual

2010-2012 PRO-RIDE RUSH Switchback RMK Service Manual, Page 338

Chassis SAFETY INFORMATION
General Cautions and Notes
Never re-use lock NutsAlways replace lock nuts that have been removed with new parts Never re-use pre-coated fastenersAlways replace pre-coated fasteners with new parts The side braces, bulkhead floor, and the front tunnel cooler upper mating surface are bonded components The only authorized bonding adhesive is Lord 406 Acrylic AdhesiveDO NOT ANY NON-SPECIFIED BONDING ADHESIVE, GLUE, OR EPOXY Lord 406 Acrylic Adhesive has shelf life of no more than 60 days at 68 (20 C) from the time of manufactureDo not store this productOrder repair kit as required and dispose product after repair is completed in accordance with local rules and regulations Wear gloves, face mask, and protective eye wear when removing original adhesive from chassis components Never apply excessive heat or flame to bonded components when not intending to remove them from the chassis The engine overstructuresteering support assembly and floor board support tubes are bonded componentsTHESE COMPONENTS ARE NOT SERVICEABLEREPLACE AS COMPLETE ASSEMBLIES Bonded components must be removed, cleaned, and re-bonded if the adhesive is subjected to temperatures above 300 (149 C) Adhesive working time is to 10 minutesComponent handling time is achieved within 60 minutesComplete cure time will take 24 hours at 68 (20 C) Allow the adhesive to cure at room temperature 68 (20 C)Do not move the snowmobile outside (colder temperature) while the adhesive is curing Do not place the vehicle into service until the adhesive has completely cured (24 hours)