2010-2012 PRO-RIDE RUSH Switchback RMK Service Manual, Page 237Get this manual

2010-2012 PRO-RIDE RUSH Switchback RMK Service Manual, Page 237

PVT System Clutch Assembly
1Assemble the rollers, bushings and roller pins if they were removed2Install the head of the weight pin so that it is on the leading side of rotationThis will orientate the nut on the trailing side of rotation3Torque weight pin to specification9Apply Loctite 243TM to shaft threadsDo not get Loctite on moveable bushing.Install the jam nut onto the shaft and torque it to specification
Spider Jam Nut Torque: 290-330 ft-lb (394-447 Nm) Apply Loctite 243TM to Threads 10Place the drive spring on the shaft11Place the cover onto the clutch and torque the cover fasteners to specification
Weight Pin Torque: 20-30 in-lb (2.2-3.4 Nm) 4Place the moveable sheave onto the stationary sheave5Place the same number of spacers on top of the stepped spacer onto the shaft of the stationary sheave
Cover Fastener Torque: 100 in-lb (11 Nm) Use cross patternNOTE: Do not allow side loading or mis-alignment of the cover or the bushing may become damaged