2010-2012 PRO-RIDE RUSH Switchback RMK Service Manual, Page 231Get this manual

2010-2012 PRO-RIDE RUSH Switchback RMK Service Manual, Page 231

PVT System PVT SYSTEM ADJUSTMENTS
Clutch AlignmentOffset
The drive and driven clutches are offset from each otherThis offset is controlled by the number and thickness of washers installed on the jackshaft behind the driven clutch1Remove drive belt2Push the driven clutch towards the bulkheadInstall the alignment tool into the drive clutch and on top of the driven clutch hubTOOL PART NUMBER APPLICATION

Driven Clutch OffsetShim Washers
Offset Washers 16 Gauge Bushing=7556509 (QTY.1) .023"7555917 (AR) .120"7555864 (AR) Float Washers .065"7555806 (AR) .105"7555832 (AR) ARAs Required

CAUTION
Always verify the driven clutch floats on the jackshaftThe jackshaft bearing will fail from side-loading if the driven clutch is not allowed to float
PS-47477

Light Weight (LWT) Team DrivenP2