2010-2012 PRO-RIDE RUSH Switchback RMK Service Manual, Page 109Get this manual

2010-2012 PRO-RIDE RUSH Switchback RMK Service Manual, Page 109

EngineCoolingExhaust DisassemblyAssembly Process 1Remove the engine from the engine compartment2Follow the process for removing the cylinder head, cylinders, pistons, flywheelrecoil housing, and the wateroil pump3Remove the intake boots, reed stuffers, and reed assemblies from the intake tracksDiscard any seals or gasketsNOTE: The crankcase ring land damage shown in the corresponding photo is caused by improper crankcase separation or crankshaft removalNOTE: Do not over-apply sealant in oil injector areaDoing so may block the oil passageDOWELS
DO NOT FILL MAG BEARING OIL GALLERY WITH CASE SEALANT