2010-2012 PRO-RIDE RUSH Switchback RMK Service Manual, Page 76Get this manual

2010-2012 PRO-RIDE RUSH Switchback RMK Service Manual, Page 76

Maintenance Brake Pad Replacement
Brake pads need to be replaced if the thickness of the friction material is less than 116" (.0625")1.5mmBrake Pad

NOTE: Never use the in-line adjuster to adjust engine idle speedNever adjust the cable so that the throttle plate cam on the throttle body no longer rests against the idle air gap screwTurning the in-line adjuster inwards (clockwise) will increase throttle lever free-playTurning the in-line adjuster outwards (counter-clockwise) will decrease throttle lever free-playAfter setting the throttle lever free play, always verify the oil pump adjustment is set correctly
Throttle Cable Routing
116(.0625")1.5mm

THROTTLE CABLE ADJUSTMENT