2010-2012 PRO-RIDE RUSH Switchback RMK Service Manual, Page 73Get this manual
Maintenance 7When installing the hood, verify the hood harness connector is routed under the over structure tube9Prior to closing the left side door panel, verify the air box intake tube is installed in both the air box and hood intake plenum
PLENUM INTAKE TUBE
HARNESS CONNECTOR INTAKE TUBE
NOTE: The hood harness connector must be routed under the over structure tube to prevent the wires from coming into contact with the other components8Engage the two console tabs with the hood plenum slots at the rear of the hoodAIR BOX PLENUM PLENUM SLOT