Bombardier SeaDoo 2001 factory shop manual, Page 423Get this manual

Bombardier SeaDoo 2001 factory shop manual, Page 423

Section 11 PROPULSION SYSTEM Subsection 02 (JET PUMP)
NOTE: If jet pump housing rest against table, raise it slightly to allow complete shaft insertion with the shaft guideRemove shaft guide
Impeller
Apply Loctite primer (PN 293 600 012) on threads of impeller shaft no28Allow to dry for minutesNOTE: Loctite primer is used to reduce Loctite 243 curing time and to activate stainless steel and aluminum surfaces for better bonding actionIf applied, complete curing time is hours, if primer is not used, allow 24 hours for curing timeApply Loctite 243 (blue) to shaft threadsF00J0HA

1Impeller shaft holder secured in vice