Bombardier SeaDoo 2001 factory shop manual, Page 232Get this manual
Section 06 ENGINE MANAGEMENT (DI) Subsection 03 (COMPONENT INSPECTION AND ADJUSTMENT)
When changing reed valve, ensure to position ring plate opening so that holes align inside the openingHoles must not be obstructed by the opening edges
2.7 Nm (24 lbfin)
F12D0BA
1Screw from bottom up
F12R04A
1Reed valve opening 2Rotate opening to align holes inside without obstructing the holes