Bombardier SeaDoo 2001 factory shop manual, Page 229Get this manual

Bombardier SeaDoo 2001 factory shop manual, Page 229

Subsection 03
Section 06 ENGINE MANAGEMENT (DI) (COMPONENT INSPECTION AND ADJUSTMENT)

Ensure spring is still well positioned on stoppersProperly reinstall the plastic cap to the synchronization screwApply Loctite 5910 flange sealant on idle set screw head
F12R1DA

1Gap here 2Spring removed

Snap throttle plate few times to ensure it is completely closedMeasure resistance between pins and 3Note the resistance valueSubstract 175 from that valueProperly reinstall the springEnsure that master throttle plate is still closedTurn synchronizing screw clockwise until reading reaches the computed value above 20 1