Bombardier SeaDoo 2000 factory shop manual volume 2, Page 10Get this manual

Bombardier SeaDoo 2000 factory shop manual volume 2, Page 10

INTRODUCTION
TYPICAL PAGE
Sub-title with part name(s) from exploded view
Section 06 FUEL SYSTEM Subsection 03 (CARBURETORS)

Title indicates main procedure to be carried-out
CARBURETOR REMOVAL
To remove carburetors from engine, proceed as follows: Remove air vent tube supportUnlock retaining slides holding air intake silencer baseRemove air intake silencer base from watercraftRemove screws holding flame arrester base support to cylinder head coverUnscrew base retaining screws then remove base from carburetors and move to front of watercraftTurn the valve to OFF positionNOTE: For fuel line removal, use pliers (PN 295 000 054)Disconnect pulse line from fuel pumpDisconnect fuel fuel supply line from fuel pumpDisconnect fuel return lineDisconnect oil injection pump cable, throttle cable and choke cableXP Model Only Remove screws no6 and lock washers no7 retaining carburetorsAll Others Models Remove bolts no8 and lock washers no12 from rotary valve cover then move carburetors and rotary valve cover on top of engineNOTE: When removing rotary valve coverpay attention that the rotary valve stay in place, other-wise it must be timedRemove carburetors from intake manifoldDisconnect fuel bypass line between carburetors (twin carburetors)Remove carburetor(s) from rotary valve cover