Bombardier SeaDoo 2000 factory shop manual volume 1, Page 351Get this manual

Bombardier SeaDoo 2000 factory shop manual volume 1, Page 351

Section 09 PROPULSION SYSTEM Subsection 05 (VARIABLE TRIM SYSTEM)
Apply Loctite Primer (PN 293 800 041) to threads of VTS housing and Loctite 243 (blue) to nut no4Install nut with sealing washer and torque to Nm (53 lbfin) using the VTS socket tool
NOTE: Activate timer to be able to position VTSBoot and Clamps
install rubber boot no3 over sliding shaft and secure with clamps8

Ball Joint
GSX RFI and XP Install ball joint on LEFT side of sliding shaft no10 using bolt no13, washers no14 and nut no15Torque nut to 10 Nm (88 lbfin)F01J3IA
1No interference 2Nozzle up