Bombardier SeaDoo 2000 factory shop manual volume 1, Page 333Get this manual

Bombardier SeaDoo 2000 factory shop manual volume 1, Page 333

Section 09 PROPULSION SYSTEM Subsection 03 (DRIVE SYSTEM)
INSTALLATION
Installation is essentially the reverse of removal procedureHowever, pay particular attention to the followingXP Model

Seal Carrier of Mid Bearing
Properly index flanges no22 togetherInstall seal carrier and hand tighten nuts no21NOTE: Apply Loctite 243 (blue) on studsAlign the seal carrier using the following tools: support plate kit (PN 529 035 506) NOTE: Use plate (PN 529 035 507) for the 155.6 mm (6-18 in) jet pump