Bombardier SeaDoo 2000 factory shop manual volume 1, Page 173Get this manual
Subsection 02
Section 05 COOLING SYSTEM (CIRCUIT, COMPONENTS AND CARE)
Pull the valve slightlyUsing pliers, release the clamp which retains the bellows no10Remove valve no9 and bellows no10
For winterization of cooling system, refer to STORAGEGS, GTS and GTI Models When servicing the hull, always rotate watercraft counterclockwise (seen from the rear)Rotating watercraft on the opposite side could allow residual water in tuned pipe to enter the engine and cause damage
F01E21A
Loosen clamp to separate valve from bellows
F01L45C
F01E24A