Bombardier SeaDoo 1996 factory shop manual, Page 250Get this manual

Bombardier SeaDoo 1996 factory shop manual, Page 250

Section 09 PROPULSION SYSTEM Sub-Section 04 (VARIABLE TRIM SYSTEM)
1, Ball Joint
Install ball joint on right side of sliding shaftTorque fasteners to 10 Nm (88 lbfin)NOTEInstall boot on sliding shaft before securing ball joint
If an adjustment is necessary, loosen jam nut of ball joint at link rodTurn adjustment nut of ball joint to obtain the desired gap between trim ring and venturi