Bombardier SeaDoo 1994 factory shop manual, Page 210Get this manual

Bombardier SeaDoo 1994 factory shop manual, Page 210

Section 08 PROPULS ON AND DRIVE SYSTEMS Sub-Section 01 (PROPULSION AND DRIVE SYSTEMS)
tightened until jet pump

NOTESeal carrier gear clamps should not be is installed, to ensure

install insert into plastic hull insert
NOTEAlign aluminum insert as much asble with PTO flywheel

NOTE :The epoxy glue curing time 30 mgn-

Jet Pump Unit