Section 08
PROPULSION AND DRIVE SYSTEMS Sub-section 03 (VARIABLE TRIM SYSTEM (VTS))

5, Trim cable
Install cable from inside the hull, apply Loctite 587 Ultra Blue PIN293 800 016) all around cable hole to ensure no leakage Install flat washers and torque nuts to(88 lbfein)b 587 Ultra

Ensure ball joint is on top of steering arm

Make sure screw is installed on top of ball joint and that ball joint is parallel to steering m

5, Trim Cable
Install ball joint and screw it in completelySecure joint on right side of trim arm using screw ball and nutMake sure screw is installed onhside of trim arm and that ball joint is parallel to trimarm Torque screw to 13 Nm (10 lbfoft)Parallel