Bombardier SeaDoo 1992 factory shop manual, Page 65Get this manual
Sub-section 04
Section 03 ENGINE (PTO FLYWHEEL AND MAGNETO)
47, PTO Flywheel
Using three M8 35 mrn screws290 841 591), install screws three puller plate and slide sleeves on screws then secure puller plate on MAG flywheel so that sleeves are against flywheelIlnstall extension handle on end of puller plate
Insert special tool in PTO flywheel splines
Impeller remover used for PTO flywheel removal