Bombardier SeaDoo 1992 factory shop manual, Page 51Get this manual

Bombardier SeaDoo 1992 factory shop manual, Page 51

Sub-section 02
Section 03 ENGINE (REMOVAL AND INSTALLATJOIN)

Pre-torque nuts in criss-cross sequenceto about 20 Nm (15 Ibfft) Torque side retaining screwts) to 25 Nm (18 Ibf-ftJ and then torque nuts in criss-cross sequence to 25 N-rn (18 Ibfaft)

All Models
Final Inspection Check throttle cable condition and lubricate cable with SEA-DO0 LUBEAfter its installation, properly adjust and synchronize oil injection pump as specified in OIL SYSTEM, 06-02 Bleed oil injection pumpPressure test fuel system, refer to FUEL SYSTEM 05-03 and look for fuel system pressurization Secure vent tube to the battery Ensure vent tube is not kinked or obstructedVerify all connections and hoses conditionRun engine and ensure there is no leakageCAUTIIONWater must be supplied cool engine with flush kit (PN 295 000 038)