Bombardier SeaDoo 1992 factory shop manual, Page 50Get this manual

Bombardier SeaDoo 1992 factory shop manual, Page 50

Section 03 ENGINE Subsection 02 (REMOVAL ANID INSTALLATION)
- lnsert shaft end into PTO flywheel
nNOTE :The shaft should slide easily in flywheel
splines
if the alignment is correct
18'32, Screw and Loctite 242
Apply Loctite 242293 800 015) on screw threads Retorque engine support screws to 25 Nm (18 Ibfmft) when procedure is completed
NOTEWhenever alignment tool is not utilized, apply SEA-DO0 LUBE on its shaft and inside the housing to eliminate possible corrosion
Electrical Connections First, install red positive cable on starter post and torque nut to Nrn (62 lbfin) Install black negative cable on starter mounting bolt apply Loctite 271 on threads torque to 22 Nm (16 Ilbfft) if removed Apply Neopren Grease on connectors then cover with bootShaft