Bombardier SeaDoo 1992 factory shop manual, Page 49Get this manual

Bombardier SeaDoo 1992 factory shop manual, Page 49

Section 03 ENGINE Sub-section 02AND INSTALLATION) CLEANING
Wipe off any spillage bilgeClean with bilge cleaner in Discard all gaskets and O-ringsClean external parts of engine
INSTALLATION
Installation of engine in watercraft is essentially the reverse of removal procedures However pay particular attention to the following
16,19, Rubber Mlount andScrew
Check tightness and condition of rubber mountsIf they halve been removed, apply Loctite 242 (bluet (PIN 293 800 015) on screw threadsTorque screws to 25 Nern (18 Ibfmft)
Housing295 000 0901

CAUTIONStrict adherence this torque is important avoid damaging threads of aluminum insert in bilge
9,21, Engine Support and Nlut
Properly install support on crankcase so that rounded portion of support matches with MAG side of crankcase Apply Loctite 242 Iblue) (PIN 293 800 015) on threads then torque nluts in criss-cross sequence to 35 Nm (26 lbfeft) Rotary Vallve Supply Line Make sure to reinstall lines before compfetely loweriing engine in bilge NOTE: If fuel line ends are damaged, cut damaged ends before reinstallatioln For fuel line clamping, use special pliers295 000 070)