Bombardier SeaDoo 1990 factory shop manual, Page 126Get this manual

Bombardier SeaDoo 1990 factory shop manual, Page 126

Section 07 EILECTRICAL (CDICHARGIING SYSTEMS)

TROUBLESHOOTING CHARTNIPIPONDENSO CDI SYSTEM

SIPARK TEST (Ignition module must halve been chlecked first)
5 mm, (3116"1 SPARK
TAKES PLACE

5 mrn (316 "1 SPARK DOES NOT TAKE PLACE

IGNITION COIIL AND HIIGH TENSION WIRE ARE GOOD