2000 Polaris Virage TX, SLX, Pro 1200, Genesis, Genesis FFI Personal Watercraft Service Manual, Page 192Get this manual

2000 Polaris Virage TX, SLX, Pro 1200, Genesis, Genesis FFI Personal Watercraft Service Manual, Page 192

http:ReadManm
FINAL DRIVEJET PUMPBILGE SYSTEM
Pump To Hull Alignment
3Grease the large pump sealing O-ring and apply Marine Grade Silicone Sealant (PN 8560054) to the bilge siphon tube(s), cooling water supply tube, and studs (to seal stud in hull)Install pumpHold pump inward tightly against hull while an assistant tightens stud mounting nuts inside hullTorque evenly in three steps to 28 ftIbs(38.7 Nm)Tighten 28 ftIbs(38.7 Nm) 5Torque pump mounting nuts (outside of hull) evenly in three steps to 28 ftIbs(38.7 Nm) using criss cross patternCheck to be sure pump housing is tight against hullTo inspect pump-to-hull fit, measure the gap between the hull and pump housing with feeler gaugeIf gap is present it should not exceed .010" (.25mm)Check for gap with feeler gauge