Tohatsu 4 Stroke MFS 2/2.5/3.5A Outboards Service Manual, Page 110Get this manual

Tohatsu 4 Stroke MFS 2/2.5/3.5A Outboards Service Manual, Page 110

40) Assembly of Power Unit 1Apply ThreeBond 1107 to both faces of new gasket, and attach dowel pins (2 pcs and gasket 12Install power unit 3, and tighten bolts (7 pcs in two or three steps to specified torquePower Unit Installation Bolt(4 lb ft) [0.6 kgf m]

Connect igniter leads and stop switch leads (two leads respectively)4Connect choke wire 5
Connect throttle cable 6Refer to 3.4.7G RE AS E

Apply grease to sliding parts such as rods and cablesInstall fuel tank and fuel cock ass'y 8, and tighten the bolts to specified torqueFuel Tank Bolts(4 lb ft) [0.6 kgf m]