Suzuki DF200/DF225/DF250 V6 4-Stroke Outboards Service Manual, Page 187Get this manual

Suzuki DF200/DF225/DF250 V6 4-Stroke Outboards Service Manual, Page 187

POWER UNIT

INSTALLATION
Installation is reverse order of removal with special attention to the following stepsNOTE: Do not re-use gasketAlways use new gasket
Install gasket 12 and collector 3, then tighten bolts, pre-coated with thread lock, to specified torque! Collector bolt: 23 Nm (2.3 kg-m, 16.5 lb-ft)99000-32050: Thread lock "1342"

Install funnels and funnel bracket 5, then tighten bolts and nuts securely! Funnel bracket boltnut: 23 Nm (2.3 kg-m, 16.5 lb-ft)