Suzuki DF200/DF225/DF250 V6 4-Stroke Outboards Service Manual, Page 131Get this manual

Suzuki DF200/DF225/DF250 V6 4-Stroke Outboards Service Manual, Page 131

ENGINE CONTROL SYSTEM

INSTALLATION Installation is reverse order of removal with special attention to the following steps Before installing oil pressure switch, wrap screw threads with sealing tape then tighten switch to specified torqueNOTE: Cut off any excess sealing tape from switch threads before installation+ Oil pressure switch: 13 Nm (1.3 kg-m, 9.5 lb-ft) Start engine and check oil pressure switch for oil leakageReseal switch if oil leakage is found
1Sealing tape

OCV (Oil control valve)