2009-2010 Suzuki DF70A DF80A DF90A Outboard Service Manual, Page 252Get this manual

2009-2010 Suzuki DF70A DF80A DF90A Outboard Service Manual, Page 252

2A-10 Housing and Bracket: Upper Mount and Mount Cover Assemble these items in the following sequence: Place upper thrust mount (1) and upper mounts (2) on upper mount bolts (3) Install dampers (4) to thrust mountNOTE Install upper thrust mount with the lettered mark "UP" facing upward Install the upper mount cover (5) Tighten upper mount cover bolts, pre-coated with thread lock, to specified torqueTightening torque Upper mount cover bolt (a): 50 Nm (5.0 kgf-m, 36.0 lbf-ft)Thread lock cement 9900032050 (SUZUKI Thread Lock 1342 (50 g))