2009-2010 Suzuki DF70A DF80A DF90A Outboard Service Manual, Page 238Get this manual

2009-2010 Suzuki DF70A DF80A DF90A Outboard Service Manual, Page 238

1K-7 Charging System: Flywheel Install flywheel and tighten flywheel bolt to specified torqueRefer to "Flywheel Removal and Installation" (Page 1K5)Special tool0993048720 (Flywheel holder) Tightening torque Flywheel bolt: 196 Nm (19.7 kgf-m, 142 lbf-ft)
RectifierRegulator Removal and Installation
Removal CAUTION Prior to removing electrical parts, disconnect battery cables from battery
Z9J0111B06005

1) Disconnect lead wire connector (1) from rectifier regulator2) Remove the bolts (2) and rectifierregulator (3)2 3

Battery Charge Coil Inspection

Measure battery charge coil resistance in the following procedure1) Disconnect battery charge coil leads from rectifier regulator2) Measure resistance between leads in the combinations shownIf measurement exceeds specification, replace battery charge coilSpecial tool0993099320 (Digital tester) Tester knob indication Resistance) Battery charge coil resistance Terminal for tester probe connection Yellow to Yellow Yellow to Yellow Yellow to Yellow 1