2006-2010 Suzuki DF150 / DF175 4-Stroke Outboards Service Manual, Page 269Get this manual
POWER UNIT
16Remove the special tool (pin) from PORT balancer No.1 gear and No.2 gear 3$ 09917-29610: Scissors gear alignment tool set
INSTALLATION
Installation is reverse order of removal with special attention to the following steps! Do not reuse gasketsAlways replace with new one1Insert the dowel pins and place counter-balancer mechanism assembly into position on the crankcase