2006-2010 Suzuki DF150 / DF175 4-Stroke Outboards Service Manual, Page 164Get this manual

2006-2010 Suzuki DF150 / DF175 4-Stroke Outboards Service Manual, Page 164

ENGINE ELECTRICAL

PERFORMANCE TESTEach test must be performed within seconds to avoid coil damage from overheating( When performing the following test, be sure to connect the battery and the starting motor with lead wire of the same size as original equipment
PULL-INHOLD-IN TEST Connect battery to magnetic switch as shown in figure Check that plunger and pinion (over-running clutch) move outwardIf plunger and pinion don't move, replace magnetic switchNOTE: Before testing, disconnect brush lead from terminal "M"