1996-2005 Suzuki DF40, DF50 Four Stroke Outboard Service Manual, Page 309Get this manual

1996-2005 Suzuki DF40, DF50 Four Stroke Outboard Service Manual, Page 309

DF40QHDF50QH 11-18 INSTALLATION Installation is reverse order of removal with special attention to the following stepsTiller handle assembly Install three (3) nylon bushes into tiller handle mounting hole and set tiller handle on handle bracket Place three (3) washers and spring into positionInsert handle pivot bolt 5Coat pivot bolt threads with thread lock and tighten pivot bolt to specified torqueHandle pivot bolt: 45 N.m (4.5 kg-m, 32.5 lbft 99000-32050: Thread Lock 1342