Mercury Mariner V-250 V-275 Outboard Service Shop Manual 1990, Page 213Get this manual

Mercury Mariner V-250 V-275 Outboard Service Shop Manual 1990, Page 213

Propeller Shaft REASSEMBLY INSTALLATION
1In sert clutch actuator rod part way into end of propeller shaft, then install cam follower onto the end of rod and push rod the rest of the way into propeller shaftA lign cross pin slot in actuator rod with cross pin slot in propeller shaft
aCompression SpringsCam Follower

Clutch Actuator Rod Installed Inlo Propeller Shalt

2Position slid ing clutch onto propeller shaft with grooved rings (on sliding clutch) toward propeller end of propeller shaftCross pin hole and detent holes (in sliding clutchmust line up with cross pin slot and detent notches on propeller shaft

aCross Pin Tool (91-86642)Cross Pin

Installing Cross Pin 5Apply sma ll amount of Quicksilver Bearing Assembly Lubricant on each detent pin Position detent pin in each detent pin hole of slidi ng clutch with rounded end of pins toward propeller shaft