Mercury Mariner 25HP 4-Stroke Outboard Service Manual 1997, Page 281Get this manual

Mercury Mariner 25HP 4-Stroke Outboard Service Manual 1997, Page 281

Shift Cable Installation Install cables into the remote control following the instructions provided with the remote controlNOTE: Install the shift cable to the engine firstThe shift cable is the first cable to move when the remote control handle is moved out of neutral1Position remote control into neutral
5Pu sh in on the cable end until resistance is felt
6While pushing in on the cabl end, adjust the cable barrel (b) to aHain the measured distance

a taken in Step 3

2Shift outboard into neutral3Measure the distance (a) between pin and center of lower hole

'1'1''1'1''1'1,"''('1''1 1''1 1''1'1''(11''1 1' ,""I,1,1,11, ,1,1, ,1,1, 1,1, ,1,1, 1,1, I," 01,',1 1