1985 Mercury Outboard V-300 V-3.4L Shop Service Manual, Page 191Get this manual

1985 Mercury Outboard V-300 V-3.4L Shop Service Manual, Page 191

NOTE: During inslaUation of gear housingit nulY be neees $l1ry 10 rolale shift lever (Figure 10) slightly 10 align upper an(i lower shifl shaft splines6Posit ion gear hou sing so that thedrillc shaft is prolruding in to drille shafl ousing7Rou le speedometer hose up Ihru sllift shafl hole in mid section (Figure II)
NOTE: When performing StepB, ifthedrileshaft splines will nol align with crankshaft splinesplace propeller onto pro peller shaft and turn it counterclockwise as the gear housing is being pished toward drive shaft housing8Mo ve gear housing up toward dri ve shaft housing, while ligning upper and lower sh ift shafl splines, and water tube wi th water tube guide (in ",'ater pump bod yl9Place washers onto stud (2 located on either side of drive shafl housing)Star nul 011 these Sludsand tighten fingertight(Figure II)

aLocknut and WasherBolts and Washers

Figure 12Gear Housing Installation
10Sta rt re maining bolt s, nu ts, and washers at front and rear of gear housi ng(Figures 11 and 12) DO NOT tight en bol lS or nu ts at this timeIIRecheck shifl shaft spline engagement and correct if necessa ry12Torque IIl1ts whic were started ill Step 910 40 lbsft(54.2 Nm) 13After nut (located 11 eit her side of dri'e shaft housing) are ti ght enedcheck shift operat ioll as follows: aPlace shift leller (Figll re 10) into forward gear posi ti onn ota te ywhec1 clock wi selIit wed from lOp)propcller shafl sllOuld rotate clockwisehPlace shift lever int nClitra POSi liollPropelle shaft sho uld rOlate free ly clockwise cou ntercloc kwise