2004 SR Johnson 4 Stroke 9.9-15HP Outboards Service Manual, Page 175Get this manual

2004 SR Johnson 4 Stroke 9.9-15HP Outboards Service Manual, Page 175

GEARCASE REASSEMBLY AND INSTALLATION
PROPELLER INSTALLATION Install: Propeller bushing stopper CD Propeller Propeller nut spacer Washer Nut Cotter pin Triple Guard Grease Propeller nut: 18 Nm (1.8 kg-m, 13.0 Ib-ft)
NOTE: Push cotter pin through nut and shaft, then bend to secure
GEARCASE INSTALLATION Install: Dowel pin (Qty2) Gasket Gearcase Bolt (Qty2) Moly Lube

SiSEAl] Gasket sealing compound
Gearcase bolt: 23 Nm (2.3 kg-m, 16.5 Ib-ft)