2004 SR Johnson 2-stroke 40, 50HP Service Manual, Page 47Get this manual

2004 SR Johnson 2-stroke 40, 50HP Service Manual, Page 47

INSTALLATION AND PREDELIVERY OUTBOARD RIGGING PROCEDURE Secure the battery negative (-) cable to powerhead ground terminalIn the remaining openings, route the battery cable and the oil tank wires4 1

Battery negative (-) cable

Route the oil tank wires along the same path as the battery cableRaise grommet to expose slotLeave power trim and tilt motor cable in position in the grommet
1Tilt motor cable opening 2Instrument cable opening 3Battery cable openings 4Oil tank wire openings